Interruption
Brief
Interruption
First year project, an exercise in designing within constraints. We were given criteria such as, no waste from given material, make the installation as large as possible, be site specific. My model proposal was choosen for further development in group and to be executed 1:1.
The Site
The Site
A long tall corridor between the cafe and the workshop was assigned to us.
Research
Research
Making scale models of possible interventions
Proposition
Proposition
Full scale tests were made
Resolution
Result
The finished installation